administracion
31-Aug-2007, 10:51 AM
Remediación Ambiental - Environmental Remediation!!
[101139&doc=remediation-ppt-8-31-07-compressed564
:)
[101139&doc=remediation-ppt-8-31-07-compressed564
:)
|
Ver la Versión Completa : Remediación Ambiental - Environmental Remediation administracion 31-Aug-2007, 10:51 AM Remediación Ambiental - Environmental Remediation!! [101139&doc=remediation-ppt-8-31-07-compressed564 :) administracion 31-Aug-2007, 10:51 AM Slideshow transcript Slide 1: A Environmental Remediation Project P Examples O L L ® O Environmental Strategies, Inc. www.apolloenvironmental.com Slide 2: Environmental Remediation Site remediation of soil and Underground and above ground groundwater storage tank cleaning and removal Facility decommissioning Vapor recovery, dewatering, water Structural/equipment dismantling, treatment, product recovery, on- decontamination, demolition site waste minimization, corrective Subsurface sampling and action groundwater monitor well Closure of pits, basins, installation impoundments, lagoons, sludge Specialized decontamination de-watering, etc. and/or remediation of heavy PCB clean up and metals, organics or other decontamination, competent contaminants decommissioning Landfill construction Excavation, liner installation, quality control Slide 3: Active Metal Coating Facility • Implementation of a Site-Specific Safety Plan • Installation of stormwater controls and dust suppression systems • Removal of approximately 7,500 square feet of concrete paved area • Excavation of approximately 500 cubic yards of Class 1 soil and approximately 7,300 cubic yards of Class 2 soil • Excavation of approximately 3,000 cubic yards of TSCA PCB-impacted soil Slide 4: Active Metal Coating Facility • GPS-guided surveying of excavated areas • Stockpiling, management, and loading of PCB- impacted soils for off-site transport and disposal to separate facilities as required • Backfilling and compaction testing of excavated area • Performed on-site air monitoring activities throughout excavation Slide 5: Active Metal Coating Facility ® Slide 6: Active Metal Coating Facility APOLLO ® ENVIRONMENTAL STRATEGIES, INC. Slide 7: Mine Reclamation • Implementation of the Site-Specific Health and Safety Plan • Construction of a two-mile access road • Clearing and grubbing of approximately 85 acres of land • Performing two control burns at the bottom of the former mine • Dust suppression activities • Contour grading of the 85 acres (former mine) Slide 8: Mine Reclamation • Implementation of a radiation monitoring program that utilized dosimeters and urinalyses for project personnel as well as radiation surveys of the site throughout construction activities • Excavation of approximately 440,000 cubic yards of spoil material • Construction of approximately 7,200 linear feet of gradient terraces • Ripping and disking 85 acres Slide 9: Mine Reclamation APOLLO ® ENVIRONMENTAL STRATEGIES, INC. Slide 10: Mine Reclamation APOLLO ® ENVIRONMENTAL STRATEGIES, INC. Slide 11: Mine Reclamation APOLLO ® ENVIRONMENTAL STRATEGIES, INC. Slide 12: Mine Reclamation APOLLO ® ENVIRONMENTAL STRATEGIES, INC. Slide 13: Stabilization/Solidification • Obtained approval from Illinois EPA for construction of a Corrective Action Management Unit (CAMU) for storage of contaminated materials from the Superfund site. • Developed an additive blend for treatment and solidification of contaminated soil/sediments removed from a drainage ditch area. • Conducted operations to construct 4.5-acre CAMU area with HDPE liner system. Slide 14: Stabilization/Solidification • Excavated contaminated soil/sediments from approximately 1,600 linear feet of ditch located within an environmentally sensitive marsh area. • Performed on-site treatment of contaminated materials to achieve IEPA requirements prior to placement within the CAMU. • Placed, graded and compacted approximately 4,000 cubic yards of treated soil/sediments within the CAMU. Slide 15: Stabilization/Solidification APOLLO ® ENVIRONMENTAL STRATEGIES, INC. Slide 16: Stabilization/Solidification APOLLO ® ENVIRONMENTAL STRATEGIES, INC. Slide 17: Stabilization/Solidification APOLLO ® ENVIRONMENTAL STRATEGIES, INC. Slide 18: Stabilization/Solidification APOLLO ® ENVIRONMENTAL STRATEGIES, INC. Slide 19: Stabilization/Solidification APOLLO ® ENVIRONMENTAL STRATEGIES, INC. Slide 20: Stabilization/Solidification ® Slide 21: Stabilization/Solidification APOLLO ® ENVIRONMENTAL STRATEGIES, INC. Slide 22: Stabilization/Solidification APOLLO ® ENVIRONMENTAL STRATEGIES, INC. Slide 23: Stabilization/Solidification APOLLO ® ENVIRONMENTAL STRATEGIES, INC. Slide 24: Property Development • Removal of approximately 40,000 cubic yards of metals and pesticide impacted soils for off-site disposal. • On-site treatment/stabilization of lead-impacted soils to achieve TCEQ Class 2 disposal criteria • Building and concrete demolition • QA/QC sampling, waste characterization and air monitoring Slide 25: Property Development • Backfill installation, compaction and grading • On-site soil treatment and off-site disposal • Municipal Setting Designation (MSD) for groundwater • Certificate of Completion for soil remediation Slide 26: Property Development APOLLO ® ENVIRONMENTAL STRATEGIES, INC. Slide 27: Property Development APOLLO ® ENVIRONMENTAL STRATEGIES, INC. Slide 28: Property Development APOLLO ® ENVIRONMENTAL STRATEGIES, INC. Slide 29: Property Development APOLLO ® ENVIRONMENTAL STRATEGIES, INC. Slide 30: Former Dry Cleaner Facility • Site preparation for installation of erosion controls, removal of concrete slab materials and staging of roll-off containers • Coordinated identification of subsurface utilities for subsequent removal and replacement • Management of excavated materials in staged roll-off containers in order to implement on-site treatment procedures Slide 31: Former Dry Cleaner Facility • On-site ex-situ treatment of approximately 1,200 cubic yards of contaminated materials to achieve site-specific criteria for use as backfill material • Installation of verified treated materials as backfill in excavated areas • Performed on-site air monitoring activities during work activities Slide 32: Former Dry Cleaner Facility APOLLO ® ENVIRONMENTAL STRATEGIES, INC. Slide 33: Former Dry Cleaner Facility APOLLO ® ENVIRONMENTAL STRATEGIES, INC. Slide 34: Former Dry Cleaner Facility APOLLO ® ENVIRONMENTAL STRATEGIES, INC. Slide 35: Former Dry Cleaner Facility APOLLO ® ENVIRONMENTAL STRATEGIES, INC. Slide 36: Underground Tank Removal APOLLO ® ENVIRONMENTAL STRATEGIES, INC. Slide 37: Environmental Drilling & Assessment APOLLO ® ENVIRONMENTAL STRATEGIES, INC. Slide 38: Environmental Drilling APOLLO ® ENVIRONMENTAL STRATEGIES, INC. Slide 39: Environmental Drilling & Assessment APOLLO ® ENVIRONMENTAL STRATEGIES, INC. Slide 40: Environmental Drilling & Assessment APOLLO ® ENVIRONMENTAL STRATEGIES, INC. Slide 41: Environmental Drilling & Assessment APOLLO ® ENVIRONMENTAL STRATEGIES, INC. Slide 42: Environmental Drilling & Assessment APOLLO ® ENVIRONMENTAL STRATEGIES, INC. Slide 43: Remediation Activities APOLLO ® ENVIRONMENTAL STRATEGIES, INC. Slide 44: Remediation Activities APOLLO ® ENVIRONMENTAL STRATEGIES, INC. Slide 45: Remediation Activities APOLLO ® ENVIRONMENTAL STRATEGIES, INC. Slide 46: Remediation Activities APOLLO ® ENVIRONMENTAL STRATEGIES, INC. Slide 47: Remediation Activities APOLLO ® ENVIRONMENTAL STRATEGIES, INC. Slide 48: Remediation Activities APOLLO ® ENVIRONMENTAL STRATEGIES, INC. :) |